<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Hudson, Ohio - File #: AHBR 26-72</title><link>https://hudson.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8038017&amp;GUID=E81C7BEB-26CD-4B0A-B087-383E9F9F6962</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://hudson.legistar.com/Feed.ashx?GUID=E81C7BEB-26CD-4B0A-B087-383E9F9F6962&amp;ID=8038017&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Hudson, Ohio - File #: AHBR 26-72</title><link>https://hudson.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8038017&amp;GUID=E81C7BEB-26CD-4B0A-B087-383E9F9F6962</link><guid isPermaLink="false">E81C7BEB-26CD-4B0A-B087-383E9F9F6962-2026-05-22-18-37-31</guid><description>Title: 130 N. Oviatt St (Historic District)
Addition (WRA - Wang Innovation Center)
Submitted by Jason Boltz, Wheeler Boltz Architects, LLC
a)	Staff notes this case received informal AHBR review at the February 11, 2026, meeting.
b)	Staff notes the site plan was approved by the Planning Commission at the May 11, 2026 meeting with a condition of approval to receive AHBR approval.
c)	The subject building was constructed in 1990, with an existing wing addition completed in 1996. As the building is not yet 50 years old, staff notes that it is not subject to review under the Secretary of the Interior Standards for Rehabilitation. The proposed project would instead be reviewed for compliance with the Architectural Design Standards type standards, part 4. However, overall compatibility to the surrounding buildings and campus is considered.
d)	Staff notes the AHBR requested additional study of the curtain wall. The applicant has submitted additional perspectives from surrounding streets.
e)	Staff notes removal of windows on the south elevation from the previous informal design; however, the </description><pubDate>Fri, 22 May 2026 18:37:31 GMT</pubDate></item></channel></rss>