File #: 23-98    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/4/2023 In control: City Council
On agenda: 9/5/2023 Final action: 9/5/2023
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS AND TO ENTER INTO CONTRACT FOR THE W. STREETSBORO STREET SIDEWALK INSTALLATION PROJECT; AND DECLARING AN EMERGENCY. Brief Description: The project includes the installation of a new sidewalk along W. Streetsboro Street (SR 303) from Nicholson Drive to W. Case Drive.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. W Streetsboro Rd Sidewalk Nicholon to W Case Exhibit, 2. Draft Resolution, 3. Resolution No. 23-98

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS AND TO ENTER INTO CONTRACT FOR THE W. STREETSBORO STREET SIDEWALK INSTALLATION PROJECT; AND DECLARING AN EMERGENCY.

Brief Description:   The project includes the installation of a new sidewalk along W. Streetsboro Street (SR 303) from Nicholson Drive to W. Case Drive.

Body

Legislative History

None.

Purpose & Explanation

This sidewalk project will be designed by in-house staff and will include the installation of a 5-foot-wide concrete sidewalk along SR 303 between Nicholson Drive and W. Case Drive. The sidewalk construction also includes storm drainage improvements, grading, crosswalks, lighting, electric conduits, driveways, and minor clearing and restoration.

 

The estimated total cost of construction is $817,000, which includes a 10% contingency. The City will return to City Council if the cost exceeds the above total cost of the project.

 

This project's bid was originally scheduled for 2024. Staff is requesting to move the bid to 2023, as it has identified that bidding this project in conjunction with the SR 303 Waterline Transmission Line Replacement project later this summer will result in an overall cost savings. This project will be bid at the same time as the SR 303 Water Transmission Line Replacement Project and will be installed after the waterline project is completed.

 

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

                     X                       Competitively bid and advertised for three consecutive weeks

                       Joint or Cooperative Purchase Program

                       Professional Services

                                            Other

Fiscal Impact

                                            Currently Budgeted

  X       Supplemental Appropriation Required (430 Fund - $817,000)

                          Appropriation Not Required

 

 

Does this legislation require use of an emergency clause?

__X Yes - To bid the project in conjunction with the 303 Water Transmission Line Replacement Project

___No

 

Recommendation

Suggested Action

Staff recommends that City Council approve this authorization for the City Manager to advertise, receive bids, and enter into a contract for the W Streetsboro Sidewalk Project.

Submitted by,

Thomas J. Sheridan, City Manager
Bradley S. Kosco, PE, PS, City Engineer
Jonathon Szalay, Project Designer