Legislation Details

File #: TMP-8846    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 8/25/2026 In control: City Council Workshop
On agenda: 9/8/2026 Final action:
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE ELLSWORTH MEADOWS GOLF COURSE STORM WATER MANAGEMENT PROJECT. Brief Description: This project was identified in a previous storm water management study that identified potential areas of stormwater storage within Ellsworth Meadows Golf Course to reduce flooding to downstream properties. The project would include reshaping an existing low-lying area of the golf course to provide additional storm water storage.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. Exhibit - Location, 2. Draft Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE ELLSWORTH MEADOWS GOLF COURSE STORM WATER MANAGEMENT PROJECT.

Brief Description:   This project was identified in a previous storm water management study that identified potential areas of stormwater storage within Ellsworth Meadows Golf Course to reduce flooding to downstream properties.  The project would include reshaping an existing low-lying area of the golf course to provide additional storm water storage.

Body

Legislative History

None.

Purpose & Explanation

This project was identified in a previous storm water management study that identified potential areas of stormwater storage within Ellsworth Meadows Golf Course to reduce flooding to downstream properties.  The project would include regrading of an existing low-lying area of the golf course to provide additional storm water storage. All material used will come from the site and be reshaped into a dry pond with a new control structure.

The project is scheduled for construction in Early 2027.

The estimated project cost of construction is $325,000 which includes 10% contingency.

Following the approval of this Resolution by City Council, the Engineering Department will advertise on the City’s website for 3 weeks and receive bids for this project.  Staff will only return to Council if the bids received are in excess of 10% of the Engineer’s Estimate; otherwise, the City Manager is authorized to enter into a contract with the lowest and best bidder.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04, Contracts & Purchasing:

                     X                       Competitively bid and advertised for three consecutive weeks

                       Joint or Cooperative Purchase Program

                       Professional Services

                       Other [provide explanation]

Fiscal Impact

                     x                       Currently Budgeted ($325,000, Fund 504 - 2027 Budget)

                                               Supplemental Appropriation Required 

                       Appropriation Not Required.

Does this legislation require use of an emergency clause?

                       Yes

                     X                       No

 

Recommendation

Suggested Action

Staff recommends that Council approve this authorization for the City Manager to advertise, receive bids and award for the Ellsworth Meadows Golf Course Storm Water Management Project.

Submitted by,

Thomas J. Sheridan, City Manager
Brian Griffith, Assistant City Engineer

Bradley S. Kosco, P.E., P.S., City Engineer
David Rapp, PE, PS, Assistant City Engineer