Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE CONSTRUCTION OF THE RAVENNA STREET STORM WATER MANAGEMENT POND PROJECT WITH THE LOWEST AND BEST BIDDER. Brief Description: This project involves modifying and enlarging two (2) existing ponds located at 2217 Ravenna Street, owned by the City of Hudson, to provide greater stormwater storage to mitigate flooding to downstream properties along Ravenna Street.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. Exhibit - Location Map, 2. Resolution No. 25-6
Related files: 24-12, 24-11

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE CONSTRUCTION OF THE RAVENNA STREET STORM WATER MANAGEMENT POND PROJECT WITH THE LOWEST AND BEST BIDDER.

Brief Description:  This project involves modifying and enlarging two (2) existing ponds located at 2217 Ravenna Street, owned by the City of Hudson, to provide greater stormwater storage to mitigate flooding to downstream properties along Ravenna Street.

Body

Legislative History

24-11 - Enter into Design Agreement with Osborn Engineering; 2/6/2024
24-12 - Enter into Agreement with NEORSD Agreement for Design; 2/6/2024

Purpose & Explanation

The City's consultant has finished design of proposed storm water pond improvements at the City's property at 2217 Ravenna Street.  The project will modify two (2) existing, wet ponds on the property into a single larger, dry pond.  The project will provide additional storm water storage to alleviate flooding to downstream properties.  The pond improvements are being constructed in a manner that will leave the northerly portion of the CIty parcel open for future construction needs.

The project’s estimated cost is $500,000 which includes a 10% contingency.   The project is scheduled for construction in the spring/summer, 2025 as weather permits.

To help offset costs, staff anticipates requesting usage of $300,000 of the City’s Community Cost Share Funds that have been collected by the North East Ohio Regional Sewer District (NEORSD).  NEORSD allocates 25% of annual stormwater fees from each member community to a Community Cost-Share account. These funds are then disbursed to through a grant application and reimbursement process for stormwater management projects.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

                     X                       Competitively bid and advertised for three consecutive weeks

                       Joint or Cooperative Purchase Program

                       Professional Services

                                            Other

Fiscal Impact

                     X                       Currently Budgeted (504 fund - $500,000)

                                            Supplemental Appropriation Required

                       Appropriation Not Required.

Does this legislation require use of an emergency clause?

        Yes

                     x                       No

 

Recommendation

Suggested Action

Staff recommends that Council approves this authorization for the City Manager to advertise, receive bids and award to the lowest and best bidder for the Construction of the Ravenna Street Storm Water Management Pond Project.

Submitted by,

Thomas J. Sheridan, City Manager

Bradley S. Kosco, PE, PS, City Engineer
David Rapp, PE, PS, Assistant City Engineer