File #: 23-68    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/27/2023 In control: City Council
On agenda: 5/16/2023 Final action: 5/16/2023
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH AECOM TECHNICAL SERVICES INC. FOR THE DESIGN OF THE VALLEY VIEW ROAD AND HINES HILL ROAD SIDEWALK IMPROVEMENT PROJECT. Brief Description: . The purpose of this request for proposal (RFP) was to solicit proposals from professional design, engineering and surveying consultants (Consultant) for the analysis, engineering, and design of a 5-ft. pedestrian sidewalk along Hines Hill Road from Valley View Road to Glastonbury Drive and Valley View Road from Hunting Hollow Drive to Hines Hill Road, including storm design, retaining walls, creek crossings, traffic signage, pedestrian signals, street lighting, pavement striping, and other miscellaneous design items as described in the formal Request for Proposals (RFP).
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. Hines HIll & Valley View Sidewalk Design Map, 2. Resolution No. 23-68
Related files: 24-0003, 24-0079, 24-74

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH AECOM TECHNICAL SERVICES INC. FOR THE DESIGN OF THE VALLEY VIEW ROAD AND HINES HILL ROAD SIDEWALK IMPROVEMENT PROJECT.

Brief Description:   .

The purpose of this request for proposal (RFP) was to solicit proposals from professional design, engineering and surveying consultants (Consultant) for the analysis, engineering, and design of a 5-ft. pedestrian sidewalk along Hines Hill Road from Valley View Road to Glastonbury Drive and Valley View Road from Hunting Hollow Drive to Hines Hill Road, including storm design, retaining walls, creek crossings, traffic signage, pedestrian signals, street lighting, pavement striping, and other miscellaneous design items as described in the formal Request for Proposals (RFP).

Body

Legislative History

None.

Purpose & Explanation

In April 2023, the City sent out the RFP to seven (7) ODOT qualified civil engineering consulting firms. The proposals were due on Friday, May 7, 2023. The City received five (5) formal proposals for the Project as listed below:

AECOM Technical Services, Inc. $250,890

Thrasher $273,176

EDG $319,801

CVE $336,721

Euthenics $399,267

Arcadis Declined and did not submit.

GPD Declined and did not submit.

Following the review of the proposals and an interview with the consultants as to their ability to do the required work, along with their ODOT experience and understanding of the RFP, the City staff is recommending AECOM Technical Services, Inc. to perform the Valley View Road and Hines Hill Road Sidewalk Improvement Project. These consulting services include any needed survey, geotechnical analysis, preparation of preliminary engineering plans, multiple public meetings, Council meetings, exhibits, utility and outside agency coordination, project specifications, cost estimates and other miscellaneous services described within this RFP with the intention to bid this project for construction as early as the Spring, 2024. The consultants will provide the Request for Information (RFI) during the bid process, wetland delineation, FEMA floodplain coordination, property acquisition mapping and descriptions, and consulting during the shop drawing review. The City will pay for any permit fees and property purchase as a separate purchase order, as needed.

As with other consulting proposals, staff is requesting a 10% contingency to handle any unforeseen issues that may arise during the design and investigation work on this project. The total requested fee, including the 10% contingency = $275,979.

For any considerations above this requested amount the City staff would return to the City Council for approval.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

                          Competitively bid and advertised for three consecutive weeks

                       Joint or Cooperative Purchase Program

 X                       Professional Services

                       Other

Fiscal Impact

                     X                       Currently Budgeted  (430 fund - $380,500)

                        Supplemental Appropriation Required

                       Appropriation Not Required.

 

Does this legislation require use of an emergency clause?

                       Yes

  X                       No

 

Recommendation

Suggested Action

Staff recommends that City Council approve this Resolution authorizing the City Manager to award and enter into a professional services contract with AECOM Technical Services for the Valley View and Hines Hill Road Sidewalk Project.

Submitted by,

Thomas J. Sheridan, City Manager

Bradley S. Kosco, PE, PS, City Engineer