File #: TMP-8558    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 3/9/2026 In control: City Council Workshop
On agenda: 3/17/2026 Final action:
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE REPAIR OF TWO (2) PEDESTRIAN BRIDGES WEST OF THE FIRE STATION AND REPLACEMENT OF A PEDESTRIAN BRIDGE EAST OF BARLOW COMMUNITY CENTER. Brief Description: This project includes the repair or replacement of existing pedestrian bridges located near Ravenna Street and the easterly pond at Barlow Community Center in the City's open space.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. Exhibit - BCC Ped Bridge Repairs & Replacment, 2. Draft Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR THE REPAIR OF TWO (2) PEDESTRIAN BRIDGES WEST OF THE FIRE STATION AND REPLACEMENT OF A PEDESTRIAN BRIDGE EAST OF BARLOW COMMUNITY CENTER.

Brief Description:   This project includes the repair or replacement of existing pedestrian bridges located near Ravenna Street and the easterly pond at Barlow Community Center in the City’s open space.

Body

Legislative History

None.

Purpose & Explanation

This project involves repairing two existing pedestrian bridges-located north of Ravenna Street and west of the fire station-and replacing a third bridge at the eastern end of the Barlow Community Center property. The bridge slated for replacement has exceeded its useful life and is beginning to fail.

Repairs to the existing bridges will include deck restoration, timber railing repairs, foundation sealing, and the installation of scour protection. The replacement bridge will be of a similar size; staff anticipates utilizing a pre-fabricated structure that will be manufactured off-site and installed once the existing bridge is removed. For public safety, portions of the adjacent trail system will be closed during construction.

The estimated construction cost is $225,000, including a contingency fund.  Work is anticipated to be completed in summer/fall 2026.

Following the approval of this Resolution by City Council, the Engineering Department will advertise in the local newspaper and receive bids for this project.  Staff will only return to Council if the bids received are in excess of 10% of the Engineer’s Estimate; otherwise, the City Manager is authorized to enter into a contract with the lowest and best bidder.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04, Contracts & Purchasing:

                     X                       Competitively bid and advertised for three consecutive weeks

                       Joint or Cooperative Purchase Program

                       Professional Services

                       Other [provide explanation]

Fiscal Impact

                     x                       Currently Budgeted (504-5950 - $250,000)

                                               Supplemental Appropriation Required 

                       Appropriation Not Required.

Does this legislation require use of an emergency clause?

                       Yes

                     X                       No

 

Recommendation

Suggested Action

Staff recommends that Council approve this authorization for the City Manager to advertise, receive bids and award for the replacement of the pedestrian bridge at Barlow Community Center, SE Green.

Submitted by,

Thomas J. Sheridan, City Manager

Bradley S. Kosco, P.E., P.S., City Engineer
David A. Rapp, PE, PS, Assistant City Engineer