Skip to main content
Hudson logo
File #: 23-165    Version: 1 Name:
Type: Resolution Status: Passed
File created: 11/15/2023 In control: City Council
On agenda: 12/12/2023 Final action: 12/12/2023
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS, AWARD AND TO ENTER INTO A CONTRACT FOR THE EAST CASE WATER LINE REPLACEMENT PROJECT. Brief Description: This project will involve the replacement of the water main along E. Case Drive from SR 303 to Milford Road.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. E Case Dr WL Exhibit 11-14-23, 2. Resolution No. 23-165

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS, AWARD AND TO ENTER INTO A CONTRACT FOR THE EAST CASE WATER LINE REPLACEMENT PROJECT.

Brief Description:   This project will involve the replacement of the water main along E. Case Drive from SR 303 to Milford Road.

Body

Legislative History

There is no previous legislation.

Purpose & Explanation

The project will replace the existing, 60 plus-year-old, 6” diameter cast iron water main on E. Case with a new 8” diameter water main from SR 303, approximately 830 feet south to Milford Road.  The project also includes the replacement of water services between the main line and the right-of-way.  This section of waterline has had approximately seven breaks since 2011 and is the Public Works staff’s No. 1 water distribution system maintenance issue.   Besides reducing maintenance and interruptions to the residents, the new water line will improve fire flows in this area which feeds W. Case Drive and sections of W. Streetsboro Road. 

The Engineering Department is designing the project in-house.  Staff will be sharing the plans with nearby residents and offering site visits to discuss the project with the public prior to finalizing the design and bidding the project.  The construction of the project is currently scheduled for the winter of 2024 and is anticipated to be completed in the Spring of 2024.  The asphalt resurfacing of E. Case Drive, W. Case Drive and Lynn Drive are also scheduled for the fall of 2024, after completion of the waterline work.

Project Costs

The estimated cost of the E. Case Drive Watermain Replacement is $450,000, which includes a 10% contingency.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04, Contracts & Purchasing:

  X                       Competitively bid and advertised for three consecutive weeks

                       Joint or Cooperative Purchase Program

                                            Professional Services

                         Other

Fiscal Impact

  X                       Currently Budgeted (501-5240-$450,000)

                       Supplemental Appropriation Required

                         Appropriation Not Required

Does this legislation require use of an emergency clause?

                                            Yes

                      X                       No

 

Recommendation

Suggested Action

Staff recommends that City Council approve this authorization for the City Manager to advertise award, and enter into a contract for the E. Case Drive Waterline Replacement Projects. 

Submitted by,

Thomas J. Sheridan, City Manager

Bradley S. Kosco, P.E., P.S., City Engineer

David Rapp, PE, PS, Asst City Engineer