File #: 25-37    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/11/2025 In control: City Council
On agenda: 3/4/2025 Final action: 3/4/2025
Title: A RESOLUTION AMENDING RESOLUTION NO. 24-96 TO INCREASE FUNDING FOR THE ELLSWORTH MEADOWS GOLF COURSE - HOLE 17 RETAINING WALL INSTALLATION; AND DECLARING AN EMERGENCY. Brief Description: Hole 17 at the Ellsworth Meadows Golf Course has a long pond that due to wave action, is experiencing significant erosion along the fairway and green. Staff received permission to bid and award this project based on a budgeted amount.
Sponsors: Jeffrey L. Anzevino
Indexes: Golf
Attachments: 1. Resolution No. 24-96, 2. Bid Tabulation, 3. Resolution No. 25-37
Related files: 24-96

Title

A RESOLUTION AMENDING RESOLUTION NO. 24-96 TO INCREASE FUNDING FOR THE ELLSWORTH MEADOWS GOLF COURSE - HOLE 17 RETAINING WALL INSTALLATION; AND DECLARING AN EMERGENCY.

Brief Description:   Hole 17 at the Ellsworth Meadows Golf Course has a long pond that due to wave action, is experiencing significant erosion along the fairway and green. Staff received permission to bid and award this project based on a budgeted amount.

Body

Legislative History

Resolution 24-96 A resolution authorizing the city manager to advertise for bids and to enter into a contract for the Ellsworth Meadows Golf Course- Hole 17 Retaining Wall Installation.

Purpose & Explanation

Hole 17 at Ellsworth Meadows County Club has a long pond causing significant erosion along the fairway and green due to wave action. To address this, a 3-foot-tall wall will be installed along 600 feet of the affected area.

This Project was designed in-house and includes 80 concrete blocks, like those used on Hole 7. The project is scheduled for construction in the winter of 2025.

The estimated project cost of construction was $125,000 which didn’t include contingency. After the initial bids came in higher than expected, staff revised the scope of work to include a base bid to include a smaller portion of the wall along with an alternate which includes the balance of the project.  The city procured the blocks directly from the manufacturer in the amount of $45,000 in order to reduce contractor costs.

Since the base bid was within an acceptable range, the contract has been executed, and the contractor is proceeding with the work. Staff is now requesting additional funding to complete the work listed under Alternate 1 in the bidding documents. Proceeding with this work will result in cost savings compared to creating a separate project and minimizing disruptions to the golf course to a single occurrence. Additional funding requested in the amount of $25,000, which would complete the remaining portion of the project and provide a 10% contingency.

Project Cost Breakdown:
Geotechnical work:
                     $1,600.00
Retaining Wall Blocks:
                     $45,000.00
Misc. Fees:
                     $321.12
Base Bid:
                     $74,970.00
Base Bid Contingency:
                     $3,108.88
Alternate:                     $20,250.00
Alternate Contingency:
                     $4,750.00
Total:                     $150,000.00

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

  X                       Competitively bid and advertised for three consecutive weeks; bid tab attached:

                       Joint or Cooperative Purchase Program

                       Professional Services

                       Other [provide explanation]

Fiscal Impact

                       Currently Budgeted

X                       Supplemental Appropriation Required (504-5950- $25,000)

                       Appropriation Not Required.

Does this legislation require use of an emergency clause?

X                       Yes (to secure bid pricing, contractor currently working onsite)

                       No

 

Recommendation

Suggested Action

Staff recommends that Council approve this resolution authorizing additional funds in the amount of $25,000 to complete the Hole 17 Retaining Wall Project at the Ellsworth Meadows Golf Course.

Submitted by,

Thomas J. Sheridan, City Manager

Bradley S. Kosco, P.E., P.S., City Engineer

Kevin Powell, Public Works Director