Title: A discussion on the City of Hudson, Brandywine Creek Subwatershed Study that was completed by CDM Smith, Inc. Brief Description: The Brandywine Creek Watershed Study was completed along with the North East Ohio Regional Sewer District's (NEORSD) Cuyahoga River South Stormwater Master Plan and identified local storm water system problems and recommended solutions within the Brandywine Creek and Brandywine Creek Tributary watershed.
Indexes: Engineering
Attachments: 1. Brandywine Creek Summary Memo 020819
Related files: 17-65

Title

A discussion on the City of Hudson, Brandywine Creek Subwatershed Study that was completed by CDM Smith, Inc.

Brief Description:  The Brandywine Creek Watershed Study was completed along with the North East Ohio Regional Sewer District’s (NEORSD) Cuyahoga River South Stormwater Master Plan and identified local storm water system problems and recommended solutions within the Brandywine Creek and Brandywine Creek Tributary watershed.  

Body

Legislative History

17-65 - Authorized City to Enter into Cost-Share Agreement with NEORSD for the Brandywine Creek Watershed Study; passed 4/18/2017

Purpose & Explanation

Since 2003, the City of Hudson has completed a number of significant capital improvements and maintenance projects throughout the Brandywine Creek Watershed storm sewer system including retention pond improvements, storm sewer and culvert replacements, and other drainage infrastructure projects.  As a result, an updated, comprehensive study was required to determine the City’s next course of action to further alleviate flooding and improve water quality in the watershed.

In 2017, the City hired CDM Smith, Inc. to expand NEORSD’s Cuyahoga River South Study Master Plan to include evaluation of Hudson-specific areas of concern within Brandywine Creek watershed.  An Executive Summary of the study is attached, and staff will present the results of the study and proposed projects identified to alleviate flooding and other storm water concerns.

Staff will also report on the City-wide storm drainage projects completed since 2003.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

                       Competitively bid and advertised for two consecutive weeks; bid tab attached: [Yes/No/NA])

                       Joint or Cooperative Purchase Program

                       Professional Services

                                             Other

Fiscal Impact

                                             Currently Budgeted

        Supplemental Appropriation Required

                       Appropriation Not Required

Does this legislation require use of an emergency clause?

                                             Yes -

                       No

 

Recommendation

Suggested Action

Staff is looking for Council’s input.

Submitted by,

Jane Howington, City Manager

Thomas J. Sheridan, P.E., P.S., Assistant City Manager - Professional Services

Bradley S. Kosco, P.E., P.S., City Engineer