File #: 23-005    Version: 1 Name:
Type: Resolution Status: Passed
File created: 12/20/2022 In control: City Council
On agenda: 1/17/2023 Final action: 1/17/2023
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND ENTER INTO A CONTRACT FOR THE INSTALLATION OF PEDESTRIAN SIGNALS AT VARIOUS LOCATIONS NEAR HUDSON CITY SCHOOLS IN THE CITY OF HUDSON; AND DECLARING AN EMERGENCY. Brief Description: The project will include the installation of six (6) pedestrian signal improvements at the intersections of Stow Road and Pioneer Trail, Stow Road and Stonebridge Court, Hudson-Aurora Road and Herrick Park Drive, Hudson-Aurora Road and Hudson Street, N. Hayden Parkway and Victoria Parkway, N. Hayden Parkway and Simon Road. Staff is also recommending a pedestrian signal improvement at the intersection of E. Streetsboro Street and S. Oviatt Street be included in the project bringing the total intersections to be improved to seven (7). The estimated project cost is $250,000 which includes a 10% contingency amount.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. RRFB Location Exhibit, 2. Resolution No. 23-005
Related files: 22-0077

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR BIDS AND ENTER INTO A CONTRACT FOR THE INSTALLATION OF PEDESTRIAN SIGNALS AT VARIOUS LOCATIONS NEAR HUDSON CITY SCHOOLS IN THE CITY OF HUDSON; AND DECLARING AN EMERGENCY.

Brief Description:  The project will include the installation of six (6) pedestrian signal improvements at the intersections of Stow Road and Pioneer Trail, Stow Road and Stonebridge Court, Hudson-Aurora Road and Herrick Park Drive, Hudson-Aurora Road and Hudson Street, N. Hayden Parkway and Victoria Parkway, N. Hayden Parkway and Simon Road.  Staff is also recommending a pedestrian signal improvement at the intersection of E. Streetsboro Street and S. Oviatt Street be included in the project bringing the total intersections to be improved to seven (7).  The estimated project cost is $250,000 which includes a 10% contingency amount.

Body

Legislative History

22-0077 - Pedestrian Safety around Hudson Schools discussion; 10/25/2022

Purpose & Explanation

In August 2022, Council and staff discussed Pedestrian Safety around Hudson Schools at Unsignalized Crosswalks.  City staff hired a consultant to evaluate each of the crosswalk locations, to ensure compliance with applicable requirements, such as the Federal Highway Administration, ODOT, Ohio Manual of Uniform Traffic Control Devise, City Policy, or other applicable regulations.  The study identified that the installation of pedestrian crosswalk enhancements at the following six (6) locations are warranted:

1.) Stow Road and Pioneer Trail
2.) Stow Road and Stonebridge Court
3.) Hudson-Aurora Road and Herrick Park Drive
4.) Hudson-Aurora Road and Hudson Street
5.) N. Hayden Parkway and Victoria Parkway

6.) N. Hayden Parkway and Simon Road

This project will include the construction of Rectangular, Rapid Flashing Beacons (RRFBs) at the six (6) locations noted above.  Per the study, these crosswalks at unsignalized intersections are recommended to have the RRFBs installed due to high pedestrian crossing volume and their locations within school zones. 

In addition, the 2022 Downtown Pedestrian Safety Study recommended the installation of a new RRFB at the crosswalk on E. Streetsboro Street at S. Oviatt Street.   The City's Traffic Safety Committee reviewed the study and concurred with the study’s recommendation to install a RRFB at this unsignalized intersection, in order to bring awareness of the crosswalk on E. Streetsboro Street to drivers, given the crosswalks regular pedestrian use due to its proximity to destinations such as schools, park and Barlow Community Center and the crosswalk’s separation from other crosswalks.  The installation of RRFB improvements at the S. Oviatt Street and E. Streetsboro Street intersection is the seventh (7
th) intersection to be included in the project.

The estimated construction cost of all seven (7) pedestrian signals is approximately $250,000, which includes a 10% contingency.  The City staff will return to City Council if the bids are in excess of 10% of the Engineer’s estimate.

The installation of the RRFBs are scheduled for Summer, 2023. 

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

   X                       Competitively bid and advertised for two consecutive weeks

                       Joint or Cooperative Purchase Program

                       Professional Services

                                            Other

Fiscal Impact

                     X                       Currently Budgeted (430 fund - $250,000)

       Supplemental Appropriation Required

                          Appropriation Not Required

Does this legislation require use of an emergency clause?

_X_  Yes - The project will enhance pedestrian safety at crosswalks where being installed.

                            No

 

Recommendation

Suggested Action

Staff recommends that City Council approve this Resolution authorizing the City Manager to advertise for bids and enter into a contract for the installation of pedestrian signals at various locations near Hudson City Schools.

Submitted by,

Thomas J. Sheridan, City Manager

Bradley S. Kosco, PE, PS, City Engineer