Legislation Details

File #: AHBR 26-374    Version: 1 Name:
Type: AHBR Application Status: Agenda Ready
File created: 5/4/2026 In control: Architectural & Historic Board of Review
On agenda: 5/13/2026 Final action:
Title: 11 S. Main Street Alteration (ADA Lift) Submitted by Jarlath Caldwell a) Staff notes this proposal was previously presented to the Board as a discussion item at the February 25, 2026, AHBR meeting, at which time staff informed the Board that a formal application would be submitted at a later date. b) Staff notes the city has since coordinated with GPD Group regarding the attached drawings and with Lift Up, the manufacture of the proposed lift system. c) Staff notes the following: a. The proposed lift style was chosen to be less impactful and replicate stairs when not operational. b. The lift would be painted white. The proposed color was field color-matched to the existing structure to match. The manufacturer further recommended that the treads remain unpainted with a wood finish, while the railings were also color matched to the existing gazebo. c. Note interior railing details d. The proposed lift location off the existing southeast corner of the gazebo was chosen to be less ob...
Attachments: 1. 11 S Main St - AHBR Packet
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

11 S. Main Street

Alteration (ADA Lift)

Submitted by Jarlath Caldwell

a)                     Staff notes this proposal was previously presented to the Board as a discussion item at the February 25, 2026, AHBR meeting, at which time staff informed the Board that a formal application would be submitted at a later date.

b)                     Staff notes the city has since coordinated with GPD Group regarding the attached drawings and with Lift Up, the manufacture of the proposed lift system.

c)                     Staff notes the following:

a.                     The proposed lift style was chosen to be less impactful and replicate stairs when not operational. 

b.                     The lift would be painted white.  The proposed color was field color-matched to the existing structure to match. The manufacturer further recommended that the treads remain unpainted with a wood finish, while the railings were also color matched to the existing gazebo.

c.                     Note interior railing details

d.                     The proposed lift location off the existing southeast corner of the gazebo was chosen to be less obtrusive when compared to other elevations.

e.                     Desire of the city to incorporate ADA accessibility into the public gazebo.