File #: 21-120    Version: 1 Name:
Type: Resolution Status: Passed
File created: 9/16/2021 In control: City Council
On agenda: 10/19/2021 Final action: 10/19/2021
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH LJB, INC. FOR THE DOWNTOWN PEDESTRIAN SAFETY STUDY. Brief Description: This legislation would retain LJB, Inc. to perform a Pedestrian Safety Study within the downtown area which includes sections of SR 303, SR 91, First & Main Development and Aurora Street.
Sponsors: Craig Shubert
Indexes: Engineering
Attachments: 1. Exhibit A - Downtown Ped Safety Study Area, 2. Resolution No. 21-120
Related files: 24-26
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH LJB, INC. FOR THE DOWNTOWN PEDESTRIAN SAFETY STUDY.
Brief Description: This legislation would retain LJB, Inc. to perform a Pedestrian Safety Study within the downtown area which includes sections of SR 303, SR 91, First & Main Development and Aurora Street.
Body
Legislative History
None
Purpose & Explanation
Earlier in 2021, City staff presented on pedestrian and bicycle safety and upcoming infrastructure safety projects in Hudson. During discussions with Council, it was identified that staff should proceed with conducting a Pedestrian Safety Study to further evaluate pedestrian safety, primarily in the downtown area. After conducting resident input sessions and collecting public comments this summer, staff has proceeded with developing a study scope and solicited proposals from qualified traffic engineering consultants.
The Downtown Pedestrian Safety Study will review, analyze, and develop recommended improvements to increase pedestrian safety along travel ways and crossings in the study areas including SR 91 (between Stoney Hill Drive and W. Prospect Street), SR 303 (between SR 91 and N. Hayden Parkway), Aurora Street (between SR 91 and Franklin Street) and the First & Main area (reference Exhibit A - Study Area map). Note that the corridor along SR 303 between Boston Mills Road and SR 91 is being studied separately by the Ohio Department of Transportation.
The study request for proposals was sent out to seven (7) engineering firms. Three (3) firms submitted proposals including TranSystems, EDG and LJB. Three staff members reviewed the proposals (Thom Sheridan, Brad Kosco and Nate Wonsick) and based on the reviews; staff has identified the best consultant is LJB at a design fee of $108,964. This fee includes existing data and field conditions review, additional traffic data collection, public input meetings, Council presentation of preliminary report ...