File #: 22-3    Version: 1 Name:
Type: Resolution Status: Passed
File created: 12/10/2021 In control: City Council
On agenda: 1/18/2022 Final action: 1/18/2022
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS AND TO ENTER INTO A CONTRACT FOR THE EAST STREETSBORO STREET WATER IMPROVEMENT PROJECT. Brief Description: This project will involve the abandonment of a failing 4" diameter watermain. The 4" diameter watermain currently has 4 residential water services connected to it that will need to be transferred to an existing 8" diameter watermain located along the south side of E. Streetsboro Street between E. Main Street and College Street.
Sponsors: Craig Shubert
Indexes: Engineering
Attachments: 1. E Streetsboro Water Main Replacement Exhibit, 2. Resolution No. 22-3
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS AND TO ENTER INTO A CONTRACT FOR THE EAST STREETSBORO STREET WATER IMPROVEMENT PROJECT.
Brief Description: This project will involve the abandonment of a failing 4" diameter watermain. The 4" diameter watermain currently has 4 residential water services connected to it that will need to be transferred to an existing 8" diameter watermain located along the south side of E. Streetsboro Street between E. Main Street and College Street.
Body
Legislative History
None.
Purpose & Explanation
The project will include the abandonment of an existing 4" diameter cast-iron watermain, located under the northern lane of E. Streetsboro St., that is undersized and failing. The existing 4" diameter watermain has had numerous breaks over the last three years. Currently there are four (4) property services on the northside of E. Streetsboro that are tied to the existing 4" diameter watermain that will need to be transferred to an existing 8" diameter main located along the south side of W. Streetsboro Street. Upon completion of the service transfers, the old 4" diameter main will be cut, capped and abandoned in place.
The estimated costs of construction of the project, including a 10% contingency is $100,000. The project design is nearly complete and is planned for construction this spring.
Legal Authority for Proposed Legislation
Pursuant to Charter Section 6.04:
X Competitively bid and advertised for three consecutive weeks
Joint or Cooperative Purchase Program
Professional Services
Other
Fiscal Impact
X Currently Budgeted (501 fund - $100,000)
Supplemental Appropriation Required
Appropriation Not Required.
Does this legislation require use of an emergency clause?
Yes
x No

Recommendation
Suggested Action
Staff recommends that City Council approve this authorization for the City Manager to advertise and receive bids and award for the E. Streetsboro W...