File #: 21-40    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/30/2021 In control: City Council
On agenda: 4/20/2021 Final action: 4/20/2021
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH THE TRANSYSTEMS CORPORATION OF OHIO FOR THE MIDDLETON ROAD AND STOW ROAD SIDEWALK IMPROVEMENT PROJECT. Brief Description: The purpose of this proposal was to solicit proposals from professional design, engineering and surveying consultants (Consultant) for the analysis, engineering, and design of a 5-ft. pedestrian sidewalk on Middleton Road (Valley View Road to the I-480 Bridge) Stow Road (Middleton Road to Pine Trails Drive) including storm design, retaining walls, traffic signage, pedestrian signals, street lighting, pavement striping, and other miscellaneous design items as described in the formal Request for Proposals (RFP).
Sponsors: Craig Shubert
Indexes: Engineering, Streets / Sidewalks
Attachments: 1. Middleton Road (SR 91 to I-480) & Stow Road Site Map, 2. Middleton Road (Valley View to SR 91) Site Map, 3. Middleton and Stow Road Sidewalk Improvement Project - RFP, 4. Resolution No. 21-40
Related files: 21-8, 24-100, 22-159
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH THE TRANSYSTEMS CORPORATION OF OHIO FOR THE MIDDLETON ROAD AND STOW ROAD SIDEWALK IMPROVEMENT PROJECT.
Brief Description: The purpose of this proposal was to solicit proposals from professional design, engineering and surveying consultants (Consultant) for the analysis, engineering, and design of a 5-ft. pedestrian sidewalk on Middleton Road (Valley View Road to the I-480 Bridge) Stow Road (Middleton Road to Pine Trails Drive) including storm design, retaining walls, traffic signage, pedestrian signals, street lighting, pavement striping, and other miscellaneous design items as described in the formal Request for Proposals (RFP).
Body
Legislative History
Resolution No. 21-8 - Adopted in Concept the Updated Sidewalk and Trails Master Plan 2021-2025; passed 2/16/2021.
Purpose & Explanation
In January 2021, the City sent out the RFP to five (5) ODOT qualified civil engineering consulting firms. The proposals were due on February 12, 2021. The City received four (4) formal proposals for the Project as listed below:
The TranSystems Corporation $ 308,961
AECOM $ 369,850
EDG $ 412,733
GPD $ 572,689
Following the review of the proposals and an interview with each consultant as to their ability to do the required work, along with their ODOT experience and understanding of the RFP, the City staff is recommending TranSystems Corporation of Ohio to perform the Middleton Road and Stow Road Sidewalk Improvement Project.
These consulting services include the survey, geotechnical analysis, preparation of preliminary engineering plans, multiple public meetings, Council meetings, exhibits, ODOT coordination at I-480 intersections, project specifications, cost estimates and other miscellaneous services described within this RFP with the intention to bid this project for construction in the Spring, 2022. The consultants will provide the Request for Information (RFI) during t...