Title: 6492 Elmcrest Dr Alteration (Applied Stone & Siding) Submitted by Bob Zickefoose a) Section IV(1(d)(2) of the Architectural Design Standards state that the materials used in the main body must be applied consistently on that mass on all sides of the structure. Section III-1 (g)(3) of the Architectural Design Standards states that exposed foundations and tie courses shall be of a consistent material on all elevations. Staff notes the applicant is proposing applied stone detail that would not be applied around the entire mass. Additionally, staff notes the proposed stone on the front elevation terminates on an outside corner. However, staff notes that the existing brick material on the front elevation is currently non-conforming and terminates on an outside corner. b) Suggest the exposed foundation be continued along the rear elevation and terminate a the 3 seasons room to meet this requirement. c) Verify stone placement on side elevation. d) Verify horizontal siding is proposed on gara...
Attachments: 1. 6492 Elmcrest Dr - AHBR Packet
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

6492 Elmcrest Dr

Alteration (Applied Stone & Siding)

Submitted by Bob Zickefoose

a)                     Section IV(1(d)(2) of the Architectural Design Standards state that the materials used in the main body must be applied consistently on that mass on all sides of the structure. Section III-1 (g)(3) of the Architectural Design Standards states that exposed foundations and tie courses shall be of a consistent material on all elevations. Staff notes the applicant is proposing applied stone detail that would not be applied around the entire mass. Additionally, staff notes the proposed stone on the front elevation terminates on an outside corner. However, staff notes that the existing brick material on the front elevation is currently non-conforming and terminates on an outside corner.

b)                     Suggest the exposed foundation be continued along the rear elevation and terminate a the 3 seasons room to meet this requirement.

c)                     Verify stone placement on side elevation.

d)                     Verify horizontal siding is proposed on garage front elevation.

e)                     Verify proposed stone material on columns would match proposed stone foundational material.