Skip to main content
Hudson logo
File #: 25-141    Version: 1 Name:
Type: Resolution Status: Consent Agenda Ready
File created: 8/29/2025 In control: City Council
On agenda: 9/16/2025 Final action:
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH GPD GROUP FOR THE DESIGN OF BARLOW COMMUNITY CENTER UPPER LAKE DAM EMBANKMENT REPAIR PROJECT; AND DECLARING AN EMERGENCY. Brief Description: During a recent inspection of the upper dam at the Barlow Community Center, a settlement was discovered. This request is for a professional consultant to provide design, engineering, and surveying services to repair the settled area in accordance with the Ohio Department of Natural Resources' Dam Safety requirements.
Sponsors: Jeffrey L. Anzevino
Indexes: Engineering
Attachments: 1. Exhibit - Barlow Comm Center Dam Repairs 2025, 2. Resolution No. 25-141
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH GPD GROUP FOR THE DESIGN OF BARLOW COMMUNITY CENTER UPPER LAKE DAM EMBANKMENT REPAIR PROJECT; AND DECLARING AN EMERGENCY.
Brief Description: During a recent inspection of the upper dam at the Barlow Community Center, a settlement was discovered. This request is for a professional consultant to provide design, engineering, and surveying services to repair the settled area in accordance with the Ohio Department of Natural Resources' Dam Safety requirements.
Body
Legislative History
None.
Purpose & Explanation
In 2023, the City completed the Barlow Community Center Dam Improvements project, which upgraded the dams for both the upper and lower lakes, as well as the emergency spillway and walking trails. Following the project's completion, the Ohio Department of Natural Resources (ODNR) inquired about the location and condition of an abandoned drain line that connected the two lakes.
At the direction of City staff, the City's contractor excavated on the east and west embankments in the suspected location of the old drain pipe but could not find it. After the exploratory excavation, staff recorded the measurements and instructed the contractor to backfill the hole.
This spring, during a routine dam inspection, staff noticed a settlement in the upper lake dam near the excavated area. Since the dam is regulated by the ODNR, City staff contacted them to get their input on how to best investigate and repair the settled area. The ODNR recommended keeping the water levels of both the upper and lower lakes as low as possible, conducting a geotechnical review of the settled area, and, if necessary, developing a professional engineering plan to repair it.
The GPD Group, which is familiar with the City's infrastructure and has in-house dam engineers, worked with City staff to test and review the settled areas. They confirmed the need for a professional engineering plan, which w...