File #: 21-30    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/23/2021 In control: City Council
On agenda: 3/16/2021 Final action: 3/16/2021
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH O.R. COLAN ASSOCIATES, INC. FOR RIGHT-OF-WAY ACQUISITION SERVICES FOR THE STATE ROUTE 91 SOUTH SAFETY IMPROVEMENT PROJECT (PID 106445). Brief Description: The SR 91 South Safety Improvement Project design limits are on SR 91 (S. Main Street) from Barlow Road to the Stoney Hill Drive intersection. The project scope includes the widening of SR 91 to accommodate a center two-way left turn lane and resurfacing throughout the project length, 5-foot-wide bike lanes and sidewalks will be constructed on the east and west side of SR 91, traffic signal upgrades, storm sewer improvements, and repair to heaving shoulders.
Sponsors: Craig Shubert
Indexes: Engineering
Attachments: 1. Resolution No. 21-30
Related files: 18-186, 18-0101, 20-22, 20-165, 18-97, 21-153, 21-152, 21-138, 21-122, 21-139, 21-154, 22-40, 22-72, 22-73
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES CONTRACT WITH O.R. COLAN ASSOCIATES, INC. FOR RIGHT-OF-WAY ACQUISITION SERVICES FOR THE STATE ROUTE 91 SOUTH SAFETY IMPROVEMENT PROJECT (PID 106445).
Brief Description: The SR 91 South Safety Improvement Project design limits are on SR 91 (S. Main Street) from Barlow Road to the Stoney Hill Drive intersection. The project scope includes the widening of SR 91 to accommodate a center two-way left turn lane and resurfacing throughout the project length, 5-foot-wide bike lanes and sidewalks will be constructed on the east and west side of SR 91, traffic signal upgrades, storm sewer improvements, and repair to heaving shoulders.
Body
Legislative History
18-0101 - Discussion and Update on the S. Main Street Improvements Project; 10/9/2018
18-186 - Enter into an LPA Agreement; 12/4/2018
18-97 - Enter into a Preliminary Engineering Design and Study with GPD Group; 7/24/2018
20-165 - Submit Plan to Hudson Planning Commission for Report and Recommendation; 12/15/2020
20-22 - Enter into Final Engineering Design Contract with GPD Group; 3/3/2020
Purpose & Explanation
The study and design of the SR 91 South Safety Improvement Project is nearing completion. The project design includes a new roadway section consisting of three - 11 ft. wide lanes (2 thru lanes and one center turn lane), 5-foot on-street bike lanes on each side, along with a 5-foot concrete sidewalk on each side of the road. Other project improvements include traffic signal upgrades, storm sewer improvements, and repair to heaving shoulders. The final design of the project is currently in progress and is anticipated to be completed by Fall, 2021. Project construction is scheduled for 2022.
Due to the widening of the roadway and other improvements, temporary right-of-way acquisitions are required from approximately 14 parcels along SR 91. Federal funds are being utilized for the construction and right-of-way services for...

Click here for full text