Hudson logo
File #: 20-24    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/10/2020 In control: City Council
On agenda: 3/3/2020 Final action: 3/3/2020
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH GPD GROUP FOR PROFESSIONAL SERVICES FOR THE STUDY PHASE OF DESIGN OF THE OWEN BROWN STREET BRIDGE REPLACEMENT PROJECT. Brief Description City staff requested ten (10) consultants submit a proposal for the design of the Owen Brown Street Bridge Replacement Project. A total of five (5) consultants submitted proposals, and GPD Group was selected as the consultant with the best design proposal and fee.
Sponsors: Craig Shubert
Indexes: Engineering
Attachments: 1. Owen Brown St. Bridge Map, 2. Owen Brown St. Infrastructure Projects Map, 3. Resolution No. 20-24
Related files: 19-79
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH GPD GROUP FOR PROFESSIONAL SERVICES FOR THE STUDY PHASE OF DESIGN OF THE OWEN BROWN STREET BRIDGE REPLACEMENT PROJECT.
Brief Description City staff requested ten (10) consultants submit a proposal for the design of the Owen Brown Street Bridge Replacement Project. A total of five (5) consultants submitted proposals, and GPD Group was selected as the consultant with the best design proposal and fee.
Body
Legislative History
Res. No. 19-79, authorizing Cost Share Agreement with NEORSD; passed 5/21/2019.
Purpose & Explanation
In March 2019, City of Hudson, in association with the Northeast Ohio Regional Sewer District (NEORSD) finalized a study titled the "Cuyahoga River South (CRS),
Stormwater Master Plan (SWMP) - City of Hudson Community Report". The CRS SWMP
study identified problems and recommend stormwater solutions, within the Brandywine Creek Watershed, to improve regional storm water management and water quality in the watershed. The study recommended replacement of the bridge on Owen Brown Street that is currently hydraulically undersized.

In May 2019, NEORSD confirmed that it would reimburse the City for the cost of the design and construction of the replacement of the bridge and other storm water related improvements associated with the bridge project on Owen Brown Street.

City staff selected ten (10) qualified consultants to submit a technical proposal and a separate, sealed fee proposal, for the Study Phase of design of the replacement of the Owen Brown Street Bridge that will address the suggested NEORSD improvements. A total of five (5) of the consultants submitted proposals. The City and NEORSD reviewed all of the technical proposals and identified the top three (3) consultant's technical proposals. City staff then opened those top three consultant's sealed fee proposals and selected the consultant with the lowest fee to perform the design. The consultant...

Click here for full text