| 16-0055 | 1 | A. |  | Staff Report | Discussion:  Town Hall Structural Repairs
Executive Summary:  During the Town Hall first floor demolition activities, contractors uncovered a pre-existing unstable brick wall at the east end of the building.    A structural repair solution was presented by an architectural / engineering firm and was subsequently approved by staff, and repairs were made, for which City staff has assumed responsibility. | discussed |  | Action details |  Video |