18-0052
| 1 | A. | | Staff Report | Discussion: Annual Road Program, Capital Projects Update and Storm Water Rankings Update and Review
Executive Summary: This meeting will focus on the annual road program and other capital improvement projects. | discussed | |
Action details
|
Video
|
18-91
| 1 | B. | | Ordinance | AN ORDINANCE ENACTING NEW CHAPTER 1421, “EROSION AND SEDIMENT CONTROL CODE,” OF THE BUILDING CODE AND AMENDING SECTION 1, “PLAN SUBMISSION AND GENERAL NOTES,” OF CHAPTER 1419, “ENGINEERING STANDARDS FOR INFRASTRUCTURE CONSTRUCTION” OF THE BUILDING CODE.
Executive Summary: The City of Hudson’s Storm Water Management Plan (SWMP) was developed to address the Environmental Protection Agencies (EPA) National Pollutant Discharge Elimination System (NPDES) requirements for storm water quality regulations. In order to comply with the EPA’s requirements, the City must amend its Codified Ordinances to adopt regulations for erosion and sediment control which address stormwater management practices during construction and post-construction. | item forwarded | |
Action details
|
Video
|
18-0053
| 1 | C. | | Staff Report | Discussion: The College Street Traffic Impact Study results.
Executive Summary: The City Staff conducted a traffic study for College Street from Hudson St. to Chapel St. along with the adjacent roadway network to determine the impacts this temporary road closure has on the existing roadway network in this area of Hudson. (See attached conclusions summary from the TMS Engineers Study.) | discussed | |
Action details
|
Video
|
18-74
| 1 | D. | | Resolution | A RESOLUTION TO ACKNOWLEDGE THE CITY’S COMMITMENT TO ENVIRONMENTAL SUSTAINABILITY AND BEST PRACTICES.
Executive Summary: The City government in its culture and actions will reflect its commitment to environmental sustainability and will continuously improve environmental practices and will continue to strive to be a model of environmental best practices for the future of the community. | item forwarded | |
Action details
|
Video
|