Hudson logo
Meeting Name: City Council Workshop Agenda status: Final
Meeting date/time: 5/12/2015 7:30 PM Minutes status: Final  
Meeting location: Town Hall
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
15-68 1A. ResolutionA RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH THE GPD GROUP FOR ENGINEERING DESIGN SERVICES FOR THE BARLOW ROAD IMPROVEMENT PROJECT; AND DECLARING AN EMERGENCY. Executive Summary: The selected consultant will develop the plans and specifications for the Barlow Road Improvement Project. The limits of the project are Barlow Road from Terex Road to SR 91 (Darrow Road). The project’s scope includes widening of the existing pavement, a multi-use path, re-grading of the ditches and storm sewer improvements. The Barlow Road grades near the rail crossing will also be improved. The design will strive to minimize the impacts to adjacent properties. Lighting at the intersections and improved signing and pavement markings are included. The Barlow Road and Terex Road intersection will be studied for short and long term solutions including realignment and signal options. The selected short term solution for intersection and the connection from west terminus of the project to connect a multi-use path to the Metro Parks Hike and Bike trail will be developed. Theitem forwarded  Action details Video Video
15-73 1A. OrdinanceAN ORDINANCE AMENDING CHAPTER 254 OF THE CODIFIED ORDINANCES ENTITLED “EMPLOYEE HANDBOOK AND PERSONNEL RULES”, TO ADOPT A CELLULAR PHONE USE AND ALLOWANCE POLICY. Executive Summary: This Ordinance adopts the City policy for cell phone use and allowance as approved by the Personnel Advisory and Appeals Board (PAAB) on April 2, 2015.item forwarded  Action details Video Video
15-0062 1B. PresentationA Discussion regarding the status of the Downtown Corridor Improvements Design. Executive Summary: GPD Group, the City’s design consultant, has been working on the plan development for the Downtown Corridor Improvement Project. The City Staff has held several meetings with the N. Main St. merchants and one meeting with the public. The sidewalk and curb materials, sidewalk on the Green, and parking have been the most significant items of feedback. Staff would like Council’s input before moving toward finalizing of the plans with the consultant.discussed  Action details Video Video