16-0055
| 1 | A. | | Staff Report | Discussion: Town Hall Structural Repairs
Executive Summary: During the Town Hall first floor demolition activities, contractors uncovered a pre-existing unstable brick wall at the east end of the building. A structural repair solution was presented by an architectural / engineering firm and was subsequently approved by staff, and repairs were made, for which City staff has assumed responsibility. | discussed | |
Action details
|
Video
|