A RESOLUTION TO APPROVE A THEN AND NOW CERTIFICATE
FOR A PURCHASE MADE; AND DECLARING AN EMERGENCY.
Brief Description: Council authorization is required for payment of the
invoice shown on this Resolution in excess of $3,000, for which a commitment
was made before a Purchase Order was generated. Approval required for:
Weston Hurd - Legal Services, $3,676.50.
Attachments:
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER
INTO A PROFESSIONAL SERVICES CONTRACT WITH QUALITY
CONTROL INSPECTION, INC. FOR CONSTRUCTION
ADMINISTRATION SUPPORT SERVICES FOR THE VALLEY VIEW
ROAD RESURFACING PROJECT (PID 116932); AND DECLARING
AN EMERGENCY.
Brief Description: The project includes the resurfacing of Valley View Road
from the North Corporation line, southeast to SR 91. Staff is requesting
permission to hire a professional construction management firm to provide
supporting services for the construction management and inspection needs for
the project.
Attachments:
F.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR
THE N. OVIATT STREET PHASE 1 IMPROVEMENTS TO THE
COLLECTION SYSTEM WITH THE LOWEST AND BEST BIDDER.
Brief Description: Residents on N. Oviatt Street notified the city that during a
2022 heavy rain, flows caused overland flooding near their homes. The N.
Oviatt Street Storm Improvement Project involves increasing the number of
access points for water to get into an existing storm box culvert. The
improvements will reduce the overland flooding, with an estimated project
cost of $100,000 including a 10% contingency.
Attachments:
G.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ADVERTISE FOR BIDS AND TO ENTER INTO A CONTRACT FOR
THE ALISA COURT DRAINAGE DITCH PROJECT WITH THE
LOWEST AND BEST BIDDER.
Brief Description: Residents on Alisa Court off of Nicholson Drive notified
the City that during heavier rains, flows along the drainage ditch adjacent to
their property are causing erosion. The Alisa Court Drainage Ditch Project
involves adding channel protection along a sharp bend in the ditch and
removing obstructions and minor regrading to reduce ditch flooding and
sediment transport, with an estimated project cost of $250,000 including a
10% contingency.
Attachments: