File #: 12-136    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/26/2012 In control: City Council
On agenda: 10/3/2012 Final action: 10/3/2012
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A LEAD PUBLIC AGENCY (“LPA”) FEDERAL PROJECT AGREEMENT WITH THE OHIO DEPARTMENT OF TRANSPORTATION FOR THE STATE ROUTE 91 AND NORTON ROAD IMPROVEMENTS PROJECT; AND DECLARING AN EMERGENCY
Sponsors: William A. Currin
Indexes: Engineering
Attachments: 1. Res. No. 12-136, 2. SR 91 & Norton Turn Lane LPA Agreement
Related files: 13-138, 13-137, 14-113, 15-163, 16-31, 15-139, 15-140, 15-151
title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A LEAD PUBLIC AGENCY ("LPA") FEDERAL PROJECT AGREEMENT WITH THE OHIO DEPARTMENT OF TRANSPORTATION FOR THE STATE ROUTE 91 AND NORTON ROAD IMPROVEMENTS PROJECT; AND DECLARING AN EMERGENCY
body
 
Executive Summary
This project will include: milling and resurfacing SR 91/Norton (including full and partial depth repairs and paving to the end of improvements); evaluating and replacing curbs as needed; evaluating storm and water system and replacing as needed; installation of sidewalk; signal improvements as needed to accommodate additional lanes and update ADA functionality at SR 91/Norton; improving pavement on all legs to required lane widths; evaluating all existing turn lane lengths; and adding additional turn lanes at the intersection as needed.
Legislative History
Resolution 11-111-Authorization to apply for STP Funds programmed by AMATS.
Purpose & Explanation
ODOT has a process that allows local public agencies (LPA) to administer projects that use Federal funding vs. utilizing ODOT for this process. The process requires the LPA (the City of Hudson) to enter into an agreement with ODOT for this process.  The agreement requires the City of Hudson to follow the federal process for items such as, contracting invoices, using domestically made materials and the environmental clearance documents.  The LPA process allows for more local control in terms of cost and schedule.  There is no additional cost to the City for this service, but it will allow the City to control more of the project design and construction administration.
The City is responsible for 100% of the design and environmental fees.  The construction and right of way costs funding split is 80%/20% (Federal/City) with the maximum Federal expenditure being $1,680,200.00.  The City's estimated total expenditure is $670,000.  The City of Stow will be participating in 50% of the local share and 10% of the construction and R/W costs.  The surveying design and bid documents will be completed in 2013-14.  The project will be completed in 2015-16.  The limits of the project are no more than 1,000 feet on each leg of SR 91 and Norton Road.
Timing Considerations
None.
Fiscal Impact
 
Currently Budgeted
Supplemental Appropriation Required (Budget request for design in 2013-14 construction in 2015-16)
Appropriation Not Required.
 
Suggested Action
It is recommended that City Council approve the resolution authorizing the City Manager to enter into an LPA agreement with ODOT for the SR 91 and Norton Road Improvements.  We are requesting that an emergency clause be added to the resolution in order to expedite the project as it protects the public welfare and safety.
Respectively Submitted,
Christopher J. Papp, PE, Project Manager
 
Approved by: Anthony J. Bales, City Manager; Scott N. Schroyer, Asst. City Manager; Thomas J. Sheridan, PE, PS, City Engineer