File #: 16-1    Version: 1 Name:
Type: Resolution Status: Passed
File created: 12/18/2015 In control: City Council
On agenda: 1/5/2016 Final action: 1/5/2016
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH RONYAK PAVING, INC. FOR THE ANNUAL ASPHALT RESURFACING AND OVERLAY PROGRAMS; AND DECLARING AN EMERGENCY. Executive Summary: This project involves the resurfacing, repairs with asphaltic concrete, and asphalt overlay of concrete streets on various streets and city owned properties.
Sponsors: David A. Basil
Indexes: Engineering, Finance - Appropriations and Budget, Parks
Attachments: 1. Bid Tabulation, 2. Resolution No. 16-1
Related files: 15-84, 15-154, 16-0087, 16-32
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH RONYAK PAVING, INC. FOR THE ANNUAL ASPHALT RESURFACING AND OVERLAY PROGRAMS; AND DECLARING AN EMERGENCY.
Executive Summary: This project involves the resurfacing, repairs with asphaltic concrete, and asphalt overlay of concrete streets on various streets and city owned properties.
Body
Legislative History
15-84 authorized permission to advertise and obtain bids for Hudson Springs Bike Path
15-154 authorized permission to advertise and obtain bids for the capital maintenance programs.
Purpose & Explanation
Bids were received on Tuesday, December 15, 2015 for the 2016 Asphalt Resurfacing Program. Below is the Engineer's Estimate along with the respective bids.
Engineer's Estimate: $1,083,722.85
Ronyak Paving, Inc. $896,886.76
Perrin Asphalt $965,274.68
Carron Asphalt Paving, Inc. $1,032,726.18
Barbicas Construction Company, Inc. $1,090,534.89
Cross-Road Asphalt Recycling, Inc. $1,117,693.40
Chagrin Valley Paving $1,246,129.68

The total bid of $896,886.76 is broken down as follows:
Asphalt Resurfacing and Asphalt Overlay = $721,545.10 (General Fund)
Hudson Springs Park Bike Path = $175,341.66 (Parks Fund)

In addition to the above work, the contract will include:
Additional Asphalt Resurfacing Street/Asphalt Overlay = $187,545.81 (General Fund)
Resurfacing of the entrance driveways at Barlow Farm Park = $196,387.60 (Parks Fund)

Total Contingency Amount = $128,082.02
The Total amount of the above items = $1,408,902.19.

The City Administration is also asking for an appropriation for the installation of the Hudson Springs Park Bike Path and the resurfacing of the entrance driveways at Barlow Farm Park in the amount of $408,902.19.

Timing Considerations
Upon authorization to proceed by the City Council, the administration will award and enter into a contract with Ronyak Paving, Inc. for the above amounts.
Fiscal Impact
X Currently Budgeted (2016 Bu...