Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN ADDENDUM TO A PROFESSIONAL SERVICES CONTRACT WITH GPD GROUP FOR ADDITIONAL CONSULTING SERVICES FOR THE VETERANS TRAIL PHASE IV PROJECT. Brief Description: This Resolution would authorize an increase to redesign the Veterans Trail Phase IV project including environmental design and permitting, easement acquisition, trail design, and drainage design work.
Sponsors: Craig Shubert
Indexes: Engineering
Attachments: 1. Veterans Trail Phase IV Alternate Trail Exhibit - Updated 5-26-20, 2. Resolution No. 20-71
Related files: 18-77, 19-74, 15-68, 16-68, 16-135, 16-154, 15-0010, 16-0020, 19-64
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN ADDENDUM TO A PROFESSIONAL SERVICES CONTRACT WITH GPD GROUP FOR ADDITIONAL CONSULTING SERVICES FOR THE VETERANS TRAIL PHASE IV PROJECT.
Brief Description: This Resolution would authorize an increase to redesign the Veterans Trail Phase IV project including environmental design and permitting, easement acquisition, trail design, and drainage design work.
Body
Legislative History
15-0010 - Barlow Road Improvement Design Option Discussion (1/27/2015)
15-68 - Enter into a Design Contract with GPD Group (5/19/2015)
16-0020 - Barlow Road Improvements Discussion (2/23/2016)
16-68 - Advertise, Bid and Award a Contract for Barlow Road Widening, Phase I (5/23/2016)
16-135 - Advertise, Bid and Award a Contract for Barlow Road Widening, Phase II (work at railroad crossing) (8/16/2016)
16-154 - Advertise, Bid and Award a Contract for Barlow/Terex Road, W. Intersection Improvements, Phase III (10/4/2016)
18-77 - Enter into Addendum with GPD for Additional Consulting Services for Veterans Trail; (6/5/2018)
19-64 - Enter into a mitigation agreement with the NCRCPD to mitigate wetland impacts for the Veterans Trail Phase IV - Barlow Road Sidewalk project (4/16/2019)
19-74 - Authorizes Bid and Award of Veterans Trail Phase IV (5/21/2019)

Purpose & Explanation
The original alignment of the Veterans Trail Phase IV/Barlow Road Sidewalk project was entirely along the north side of the right-of-way of Barlow Road, from Terex Road east to SR 91 per the Connectivity Plan. In late 2019 the Veterans Trail Phase IV/Barlow Road Sidewalk Project has had a second and final public input meeting. The section of trail from Terex Road to Nicholson Drive was postponed due to resident feedback. Since then, City staff has continued to evaluate an alternative alignment for the Veterans Trail Phase IV portion of the project through the Grace Presbyterian Church property located at 781 Terex Road and along the north side of Terex Roa...

Click here for full text