Hudson logo
File #: 19-19    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/31/2019 In control: City Council
On agenda: 2/19/2019 Final action: 2/19/2019
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS AND TO ENTER INTO A CONTRACT FOR VETERANS TRAIL PHASE 3 PROJECT (PID 97856); AND DECLARING AN EMERGENCY. Brief Description: The project will include the installation of a multi-use path between Veterans Way Park and Barlow Road.
Sponsors: David A. Basil
Indexes: Engineering, Parks
Attachments: 1. Project Location Map, 2. Draft Resolution, 3. Resolution No. 19-19
Related files: 14-145, 17-6, 18-76, 22-29, 21-78, 19-168, 20-15

Title

A RESOLUTION AUTHORIZING THE CITY MANAGER TO ADVERTISE FOR COMPETITIVE BIDS AND TO ENTER INTO A CONTRACT FOR VETERANS TRAIL PHASE 3 PROJECT (PID 97856); AND DECLARING AN EMERGENCY.

Brief Description:  The project will include the installation of a multi-use path between Veterans Way Park and Barlow Road.

Body

Legislative History

14-145 - Authorized City to Enter into LPA Agreement with ODOT; passed 12/3/2014
17-6 - Authorized Contract with Michael Baker for Design Services; passed 1/17/2017
18-76 - Authorized Addendum with Michael Baker for Add’l Consulting Services; passed 6/5/2018

Purpose & Explanation

The project will include the installation of a 10-foot-wide mulit-use asphalt path from Barlow Road, through Ellsworth Golf Course to Cascade Park and an on-road trail along Lynn Drive, E. Case Drive, and Milford Road to Veteran’s Way.  A location map has been attached for reference.  The trail construction includes storm drainage improvements, grading, bike lane striping, a traffic calming feature on Milford Drive, tree removal, boardwalk, and new bridge.

The current estimated costs of construction of the project is $1,352,350, of which $500,000 will be paid with ODOT funding.  This costs includes a 7.5% contingency amount.  ($1,258,000 - contract + $94,350 - 7.5% contingency)

The City will also be responsible for administrative and inspection costs of $65,000 as well as a wetland mitigation cost of $61,000.  Staff will return to Council for administrative and inspection contract and mitigation contract.

The overall cost of this project is $1,478,350.00.  The total cost to the City is $978,350.00.

The project is scheduled to be formally bid in March and construction would begin in May 2019.  The construction duration will be approximately 6 months.

Legal Authority for Proposed Legislation

Pursuant to Charter Section 6.04:

                     X                       Competitively bid and advertised for two consecutive weeks

                       Joint or Cooperative Purchase Program

                       Professional Services

                                            Other

Fiscal Impact

                     X                       Currently Budgeted (205 Park Fund - $600,000)

                     X                       Supplemental Appropriation Required (205 Park Fund - $252,350)

                       Appropriation Not Required

Does this legislation require use of an emergency clause?

                     X                       Yes - In order to keep the project on schedule with ODOT’s schedule

                       No

 

Recommendation

Suggested Action

Staff recommends that City Council approve this authorization for the City Manager to advertise, receive bids, and enter into a contract for the Veterans Trail Phase 3 Project. 

Submitted by,

Jane Howington, City Manager

Thomas J. Sheridan, P.E., P.S., Assistant City Manager - Professional Services

Bradley S. Kosco, P.E., P.S., City Engineer

Nate Wonsick, P.E., Assistant City Engineer