File #: 14-113    Version: 1 Name:
Type: Resolution Status: Passed
File created: 8/19/2014 In control: City Council
On agenda: 9/3/2014 Final action: 9/3/2014
Title: A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AMENDED LOCAL PUBLIC AGENCY AGREEMENTS AND FUNDING COMMITMENTS WITH THE OHIO DEPARTMENT OF TRANSPORTATION FOR SPECIFIED PROJECTS; AND DECLARING AN EMERGENCY. Executive Summary: The following LPA Projects have received additional Federal funding from the Akron Metropolitan Area Transportation Study (AMATS) in the 2013-14 round of funding request and will require the LPA to endorse the amended agreement and assume 20% of the local match, including any cost overruns. ODOT will match 80% (maximum) of the eligible right of way and construction costs for the following State Transportation Project (STP) projects: SUM-SR 91 Downtown Improvements; PID 93820; LPA 25284 SUM-SR 91 North Turn Lanes; PID 93822; LPA 25283 SUM-SR 91 Norton Intersection; PID 93452; LPA 25285 SUM-SR 91 Prospect Intersection; PID 88548; LPA 23792
Indexes: Engineering
Attachments: 1. Resolution No 14-113
Related files: 12-135, 12-134, 12-114, 13-138, 13-137, 14-88, 12-136, 19-69, 15-13, 18-58, 19-44, 19-60, 20-3, 16-4, 17-7, 17-104, 18-57, TMP-3993, TMP-3995, 19-36, 19-43, TMP-3996, TMP-3997, TMP-3998, TMP-3999, 19-37, 19-59, 19-67, 19-68, 19-77, 19-78, 19-94, 19-99, 19-120, 19-144, 19-176, 20-49, 16-0030, 16-63, 16-0067, TMP-4033, TMP-4034, TMP-4035, TMP-4036, 19-100, 19-101, 19-114, 20-63
Title
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AMENDED LOCAL PUBLIC AGENCY AGREEMENTS AND FUNDING COMMITMENTS WITH THE OHIO DEPARTMENT OF TRANSPORTATION FOR SPECIFIED PROJECTS; AND DECLARING AN EMERGENCY.
Executive Summary:  The following LPA Projects have received additional Federal funding from the Akron Metropolitan Area Transportation Study (AMATS) in the 2013-14 round of funding request and will require the LPA to endorse the amended agreement and assume 20% of the local match, including any cost overruns.  ODOT will match 80% (maximum) of the eligible right of way and construction costs for the following State Transportation Project (STP) projects:
SUM-SR 91 Downtown Improvements; PID 93820; LPA 25284
SUM-SR 91 North Turn Lanes; PID 93822; LPA 25283
SUM-SR 91 Norton Intersection; PID 93452; LPA 25285
SUM-SR 91 Prospect Intersection; PID 88548; LPA 23792
Body
Legislative History
1.      SUM-SR 91 Downtown Improvements; PID 93820; LPA 25284
a.      Res. No. 11-111
b.      Res. No. 12-134
2.      SUM-SR 91 North Turn Lanes; PID 93822; LPA 25283
a.      Res. No. 11-111
b.      Res. No. 12-135
3.      SUM-SR 91 Norton Intersection; PID 93452; LPA 25285
a.      Res. No. 11-111
b.      Res. No. 12-136
c.      Res. No. 13-137
d.      Res. No. 13-138
4.      SUM-SR 91 Prospect; PID 88548; LPA 23792
a.      Res. No. 12-114
b.      Res. No. 14-88  
 Purpose & Explanation
The Ohio Department of Transportation (ODOT) has a program that allows the LPA to administer projects that use federal funding vs. utilizing ODOT for this administration.  The process requires the LPA (the City of Hudson) to enter into an agreement with ODOT defining the LPA responsibility.  The LPA process allows for more local control in terms of design, cost and schedule of the project.  The agreement requires the LPA to follow the federal process for item including, right-of-way acquisition, selecting consultants, contracting, invoicing, using domestically made materials and the environmental clearance procedures on the projects.  
The following LPA Projects have received additional Federal funding from the Akron Metropolitan Area Transportation Study (AMATS) in the last round of funding and will require the LPA to assume 20% of the local match, including any cost overruns.  ODOT will match a maximum of 80% of the eligible right of way and construction costs for each of the State Transportation Project Funding (STP).  The following is the funding schedule for each project:
SUM-SR 91 Downtown Improvements; PID 93820; LPA 25284
Original LPA agreement Federal funding (Resolution 12-134) $ 476,000.  2014 Amended Federal funding $ 1,537,400.  Estimated R/W Acquisition and Construction Cost $ 1,921,750.
SUM-SR 91 North Turn Lanes; PID 93822; LPA 25283
Original LPA agreement Federal funding (Resolution 12-135) $ 1,667,200.  2014 Amended Federal funding $ 1,831,456.  Estimated R/W Acquisition and Construction Cost $ 2,289,320.
SUM-SR 91 Norton Intersection; PID 93452; LPA 25285
Original LPA agreement Federal funding (Resolution 12-136) $ 1,680,000.  2014 Amended Federal funding $ 2,021,600. Estimated R/W Acquisition and Construction Cost $ 2,527,000.
SUM-SR 91 Prospect Intersection; PID 88548; LPA 23792
Original LPA agreement Federal funding (Resolution 12-29) $ 560,000.  2014 Amended Federal funding $761,760. Estimated R/W Acquisition and Construction Cost $ 952,200.
Timing Considerations
The amended LPA agreements will be executed by the City Manager once they have been approved by City Council.
Fiscal Impact
X        Currently Budgeted (Engineering is budgeted.  R/W Acquisition and Construction will be in the 5-year budget.)
        Supplemental Appropriation Required
        Appropriation Not Required.
 
Recommendation
Suggested Action
It is recommended that City Council approve the resolution authorizing the City Manager to enter into the amended LPA agreements with ODOT for the listed transportation projects as outlined in this resolution request.  We are requesting an emergency measure necessary for the immediate preservation of the public health, safety and general welfare and for the further reason that it is immediately necessary to authorize the agreement which is subject of this Resolution in order to meet construction schedules and to keep this public infrastructure safe for travel.
Submitted by,
Jane Howington, City Manager
Scott N. Schroyer, Assistant City Manager
Thomas J. Sheridan, P.E., P.S., City Engineer